Menu X TOOLS X
April 28, 2019 | 0 Comments

MetroLink Work Scheduled April 29 – May 3

Return to Blog

MetroLink train at the Shrewsbury station

Update: Due to the Blues playoffs, MetroLink will begin single track work on Friday, May 3 at 11:30 p.m.

MetroLink passengers are encouraged to plan ahead as maintenance and infrastructure work along the light rail system will require changes to MetroLink service next week. 

On Monday through Friday (April 29 – May 3) from 8 p.m. to end of service, MetroLink will operate on a single track at the Sunnen and Maplewood-Manchester MetroLink Stations to accommodate track maintenance. During these periods, eastbound Blue Line MetroLink trains will depart 5 minutes early from the Shrewsbury-Lansdowne I-44, Sunnen and Maplewood-Manchester MetroLink Stations. Westbound passengers headed to the Shrewsbury-Lansdowne I-44 Station may experience delays of up to 5 minutes. Red Line service will not be affected.

On Monday through Thursday (April 29 – May 2) from 8 p.m. to end of service and Friday (May 3) from 11:30 p.m. to end of service, MetroLink will operate on a single track at the Union Station and Civic Center MetroLink Stations to allow for work on the overhead power system.  During these periods, Blue Line MetroLink trains will only operate between the Shrewsbury-Lansdowne I-44 and Forest Park-DeBaliviere MetroLink Stations.

For more information, visit the Rider Alert or contact Metro Transit Information by calling 314-231-2345 or 618-271-2345 or texting 314-207-9786, Monday through Friday from 7 a.m. to 6 p.m.

Return to Blog
Categories:
Construction

Your email address will not be published. Required fields are marked *