MetroLink Work Scheduled November 25 – December 1
Return to BlogWork is scheduled on the MetroLink system Monday through Wednesday (November 25-27) and Friday through Sunday (November 29-December 1) and some passengers may experience short delays in the work zones. The affected areas of the MetroLink system are:
– North Hanley MetroLink Station
– UMSL North MetroLink Station
– UMSL South MetroLink Station
– Lambert Airport Terminal #1 and #2
MetroLink will operate on a single track at the North Hanley, UMSL North and UMSL South Stations from 8 p.m. until the end of service November 25-27 (Monday through Wednesday). Red Line passengers may experience 5 minute delays. Blue Line service will not be affected.
MetroLink will operate on a single track at the Lambert Airport Terminal #2 Station from 8 p.m. until the end of service November 29-December 1 (Friday through Sunday). Red Line passengers heading westbound may experience 5-10 minute delays at Lambert Airport Terminals #1 & #2. Blue Line service will not be affected.
Updates on MetroLink operations can be found at www.metrostlouis.org in the Rider Alert section.