The Lambert Airport Terminal #1 MetroLink Station will be temporarily closed starting Monday, October 12, due to airport construction work that is expected to be completed in mid-December.
MetroLink trains will not stop at Terminal #1 Station during the closure, but you can still ride MetroLink to the airport.
Heading to Terminal #1 on MetroLink
– Take a westbound Red Line train to the Terminal #2 MetroLink Station.
– Head into Terminal #2 and make your way to Exit 10 for the free airport shuttle.
– Board the airport shuttle to Terminal #1.
Leaving Terminal #1 on MetroLink
– Head to Exit 12 in Terminal #1 for the free airport shuttle.
– Board the airport shuttle to Terminal #2.
– Head to the Terminal #2 MetroLink Station and catch an eastbound Red Line train.
The shuttle connection adds a few minutes to your trip, so plan ahead and give yourself some extra time before your flight.