ALERT: MetroLink Alert - 8th & Pine, Rock Road and Wellston Stations Read More!
x
Be sure to check our Rider Alerts regularly so you can stay up to date on Metro transit service, and get last-minute changes and announcements that might affect your travel plans.

Systemwide Alerts

MetroLink Alert - 8th & Pine, Rock Road and Wellston Stations

DETAILS

8th & Pine Station | Temporarily Closed

The 8th & Pine Station in downtown St. Louis will be temporarily closed until July for station enhancements, including new staircases and other infrastructure. Trains will not stop at station during closure. A Metro Shuttle Bus is in service between the 8th & Pine and Civic Center Stations for customers traveling to/from 8th & Pine area. The shuttle operates every 20 minutes. Look for shuttle signs on Pine Street near 8th & Pine, and by the bus bays at Civic Center.

Rock Road and Wellston Stations | Westbound Platform Closed

MetroLink is operating on a single track each day from beginning of service to end of service at the Rock Road and Wellston Stations for platform improvement work that will take approximately a month to complete. During this work, the westbound platforms at Rock Road and Wellston Stations will be temporarily closed. Customers will need to board Eastbound and Westbound trains from the Eastbound platform at the Rock Road and Wellston Stations during the temporary closure.

For questions or assistance, please contact Metro Transit Information at 314.231.2345 (phone) or 314.207.9786 (text).

ALERT EFFECTIVE:
Apr 15, 2024 - Apr 30, 2024

METROLINK STATIONS AFFECTED:
8th & Pine Station
Rock Road Station
Wellston Station

MetroLink Alerts

8th & Pine Station to Close for Three Months for Station Improvements

DETAILS

The 8th & Pine MetroLink Station in downtown St. Louis will be temporarily closed for about three months, starting on Monday, April 8, for a station enhancement project. Construction crews will install new staircases and make other infrastructure improvements at the 8th & Pine Station during the project, which will take about three months to complete. The 8th & Pine Station will reopen to service this summer when the project concludes.

During the closure, customers will not be able to access the station or station platform, and MetroLink trains will not stop at the station. Metro Transit will operate a Metro Shuttle bus during the station closure between the Civic Center and 8th & Pine MetroLink Stations to support customers traveling to or from destinations near the 8th & Pine Station, including MetroStore and the Transit Access Center. The Metro Shuttle will operate every 20 minutes.

Traveling from 8th & Pine to MetroLink
Customers should look for the shuttle sign on Eighth Street, ride the shuttle to the Civic Center MetroLink Station, then board MetroLink to continue their commute.

Traveling to 8th & Pine from MetroLink
Customers should ride MetroLink to the Civic Center MetroLink Station, look for shuttle sign by the bus bays at Civic Center, then ride the shuttle to the 8th & Pine Station.

ALERT EFFECTIVE:
Mar 29, 2024 - Jul 31, 2024

METROLINK STATIONS AFFECTED:
8th & Pine Station

Single-Track Operations at Rock Road and Wellston Stations for Platform Improvement Work

DETAILS

Construction crews will repair and resurface the MetroLink platforms at the Rock Road Station as part of an improvement project that starts on Monday, April 15. The project is expected to be completed by the end of May.

Beginning April 15, the westbound platforms at the Wellston and Rock Road Stations will be temporarily closed to accommodate construction work. During the temporary closure, all MetroLink trains will serve the eastbound platforms at the Rock Road and Wellston Stations. Customers traveling both eastbound and westbound will need to use the eastbound platforms at Rock Road and Wellston Stations to board their trains.

Red Line MetroLink trains will operate on a single track between the Wellston and Rock Road MetroLink Stations from beginning to end of service each day to accommodate the construction work. Red Line MetroLink trains may experience minor delays of up to five minutes during single-track operations. Blue Line MetroLink service will not be impacted. 

ALERT EFFECTIVE:
Apr 12, 2024 - Apr 28, 2024

METROLINK STATIONS AFFECTED:
Rock Road Station
Wellston Station

MetroBus Alerts

Missouri

#1 Gold / Construction on Waterman between Union and Lake

DETAILS

Effective Date Wednesday, March 6, 2024 until further notice

REROUTE DETAILS

Westbound
Regular route to Kingshighway and Waterman
continue on Kingshighway to Delmar, 
Left on Delmar  
Left on Union  into the regular route.
Please serve the temporary bus stop on Kingshighway at Waterman. 

ALERT EFFECTIVE:
Mar 06, 2024 - Apr 30, 2024

ROUTES AFFECTED:
Gold

#1 Gold, 10 Gravois-Lindell, 18 Taylor / Construction on Taylor at Forest Park Multiple Routes

DETAILS

Effective Date:  Thursday April 28, 2022 As Needed

REROUTE DETAILS

Route TO the CWE 

Reg route to Forest Park and Taylor
Continue on Forest Park to Newstead
Right Newstead
Right Duncan
Left Taylor into Reg route

ALERT EFFECTIVE:
Dec 13, 2022 - Jun 01, 2024

ROUTES AFFECTED:
Gold
Gravois-Lindell
Taylor

#4 Natural Bridge / Events at the Enterprise Center

DETAILS

Effective Date: Monday, November 21, 2022 As Needed for events at Enterprise Center

REROUTE DETAILS

Eastbound
Regular route to Market and 14th, continue on Market to Tucker,
Right onto Tucker
Right onto Clark 
Left onto 14th into regular route                                               
Westbound
Regular route to 14th and Clark,
Right onto Clark
Left onto Tucker
Left onto Pine
Left onto 14th  
Right onto Market 
into regular route

ALERT EFFECTIVE:
Nov 21, 2022 - Dec 31, 2024

ROUTES AFFECTED:
Natural Bridge

#4 Natural Bridge / 2024 Go! St. Louis Marathon Saturday, April 27, 2024

DETAILS

Effective Date Saturday, April 27, 2024 from 6:30am until 4:00pm

On Saturday, April 27, 2024, starting at or before 6:30 am street closures will begin for the Greater St. Louis Marathon, the marathon will begin at 7:00 am affecting routes that service the   Downtown, Midtown, Soulard, Central West End, and Old North St. Louis areas.

REROUTE DETAILS

Eastbound
Regular route to Jefferson and Market
Continue on Jefferson
Left on Lafayette 
Left on Truman Pkwy into 18th St.
Right on Clark
Right on 14th
Right into the Civic Center Transit Center to the assigned bus bay                                       
Westbound
Departing from the Civic Center Transit Center
Left on 14th
Right onto the on-ramp onto Highway 64/US40 Westbound
Remain in the right lane 
Right and EXIT 38B JEFFERSON
Right Jefferson into regular route

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 27, 2024

ROUTES AFFECTED:
Natural Bridge

#4 Natural Bridge / St. Louis City Soccer Club (Events at City Park)

DETAILS

Effective Date Saturday, March 4, 2023 AS NEEDED for the duration of all Events at City Park

REROUTE DETAILS

Eastbound
Regular route to Jefferson and Market
continue on Jefferson to Chouteau
Left on Chouteau
Left on 14th St.
Right into the south entrance of the CCTC to the assigned bus bay. 
Westbound
Departing from the CCTC, 
Right on 14th St. 
Right on Chouteau
Right on Jefferson crossing Market into the regular route.

ALERT EFFECTIVE:
Mar 16, 2023 - Dec 31, 2024

ROUTES AFFECTED:
Natural Bridge

#4 Natural Bridge / Road maintenance on Parnell at Natural Bridge

DETAILS

Effective Date Thursday, April 22, 2024 AS NEEDED until further notice

REROUTE DETAILS

Eastbound 
Regular Route to Natural Bridge and Parnell, continue on Natural Bridge/Palm to 25th St.
Right on 25th St 
Right on St. Louis
Left on Parnell, continue on Parnell to 
N. Market, 
Right on N. Market
Left on Elliott
Left on Cass 
Right on Jefferson into the regular route
Westbound
Regular route to Parnell and St. Louis,
Right on St. Louis
Left on 25th St
Left on Natural Bridge into the regular route

ALERT EFFECTIVE:
Apr 22, 2024 - May 31, 2024

ROUTES AFFECTED:
Natural Bridge

#5X 8th and Pine Shuttle / GO! St. Louis Marathon

DETAILS

Effective Date Saturday April 27, 2024 from 6:00am until 4:00pm 

During the Marathon the 8th and Pine Shuttle will operate from Convention Center (6th & Washington) to 8th and Pine.

REROUTE DETAILS

Clockwise
Starting eastbound at 6th & Washington (Board and Alight passengers)
Right on Broadway
Right on Pine St (Board and Alight at 8th & Pine St)
Continue on Pine to 11th St 
Right on 11th St
Right on Washington back to 6th & Washington (Board and Alight passengers)

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 27, 2024

ROUTES AFFECTED:
ML Station Shuttle CCTC-8PIN

#8 Shaw-Cherokee / Reroute due to Laclede Gas working on Cherokee between Nebraska and Pennsylvania

DETAILS

Effective Date Thursday, April 25, 2024 AS NEEDED until further notice

REROUTE DETAILS

Northbound 
Regular route Cherokee and Nebraska 
Right on Nebraska 
Left on Utah
Left on Pennsylvania 
Right on Cherokee into regular route
Southbound 
Regular route Cherokee and Pennsylvania 
Right on Pennsylvania 
Left on Potomac
Left on Nebraska 
Right on Cherokee into regular route. 

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 30, 2024

ROUTES AFFECTED:
Shaw-Cherokee

#1 Gold, 10 Gravois-Lindell, 18 Taylor / Construction on Taylor at Forest Park Multiple Routes

DETAILS

Effective Date:  Thursday April 28, 2022 As Needed

REROUTE DETAILS

Route TO the CWE 

Reg route to Forest Park and Taylor
Continue on Forest Park to Newstead
Right Newstead
Right Duncan
Left Taylor into Reg route

ALERT EFFECTIVE:
Dec 13, 2022 - Jun 01, 2024

ROUTES AFFECTED:
Gold
Gravois-Lindell
Taylor

#10 Gravois-Lindell / 2024 Go! St. Louis Marathon Saturday, April 27, 2024

DETAILS

Effective Date Saturday, April 27, 2024 from 6:30am until 4:00pm

On Saturday, April 27, 2024, starting at or before 6:30 am street closures will begin for the Greater St. Louis Marathon, the marathon will begin at 7:00 am affecting routes that service the   Downtown, Midtown, Soulard, Central West End, and Old North St. Louis areas.

REROUTE DETAILS

Northbound
Regular route to Gravois and Interstate 55 Southbound
Right onto Interstate 55 Southbound
Exit 206/ ARSENAL
Left on Arsenal
Left on Broadway into 7th St.
Left on Lafayette
Right on Truman Pkwy into 18th St.
Right on Clark
Right on 14th 
Right into the south entrance of the Civic Center Transit Center to the assigned bus bay

Departing from the  Civic Center Transit Center to the Central West End Transit Center 
Left on 14th 
Right onto the on-ramp of Highway 64/US 40 Westbound
Remain in the right lane 
Right and Exit 38 A/ GRAND
Right on Grand
Left on Lindell into regular route

Southbound
Regular route to Lindell and Grand
Right on Grand
Left on Chouteau
Left on 18th 
Right on Clark 
Right on 14th 
Right into the Civic Center Transit Center to the assigned bus bay

Departing Civic Center Transit Center to Hampton & Gravois Transit Center 
Right on 14th 
Right on Chouteau 
Left on Truman Parkway 
Left on Lafayette 
Right on 7th into Broadway
Right on Arsenal
Right onto  Interstate 55 Northbound 
Exit 207 A/ GRAVOIS
Right on Russell
Left on 13th
Left on Gravois into regular route

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 27, 2024

ROUTES AFFECTED:
Gravois-Lindell

#10 Gravois-Lindell / St. Louis City Soccer Club (Events at City Park)

DETAILS

Effective Date Saturday, March 4, 2023 AS NEEDED for the duration of all Events at City Park

REROUTE DETAILS

Southbound
Regular route to Olive and Jefferson
Left on Jefferson
Right on Washington
Right on 14th St. 
Right into the CCTC to the assigned bus bay. 
Northbound
Departing from the CCTC
Left on 14th St.
Left on Washington
Left on Jefferson
Right on Olive into the regular route. 

ALERT EFFECTIVE:
Mar 16, 2023 - Dec 31, 2024

ROUTES AFFECTED:
Gravois-Lindell

#10 Gravois-Lindell / Events at the Enterprise Center

DETAILS

Effective Date: Monday, November 21, 2022 as needed during events at Enterprise Center

REROUTE DETAILS

Southbound
Regular route to 14th and Market,
Left on Market
Right on Tucker
Right on Clark
Left on 14th into regular route                                           
Northbound
Regular route to 14th and Clark, 
Right on Clark
Left on Tucker
Left on Olive St, continue into the regular route 

ALERT EFFECTIVE:
Nov 21, 2022 - Dec 31, 2024

ROUTES AFFECTED:
Gravois-Lindell

#11 Chippewa / 2024 Go! St. Louis Marathon Saturday, April 27, 2024

DETAILS

Effective Date Saturday, April 27, 2024 from 6:30am until 4:00pm

On Saturday, April 27, 2024, starting at or before 6:30 am street closures will begin for the Greater St. Louis Marathon, the marathon will begin at 7:00 am affecting routes that service the Downtown, Midtown, Soulard, Central West End, and Old North St. Louis areas.

REROUTE DETAILS

Eastbound  
Regular route to Jefferson and Lafayette
Right on Lafayette
Left on Truman Parkway into 18th St.
Right on Clark
Right on 14th 
Right into the Civic Center Transit Center to the assigned bus bay
Westbound  
Departing from Civic Center Transit Center
Right on 14th 
Right on Chouteau 
Left on Truman Parkway 
Right on Lafayette 
Left on Jefferson into regular route

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 27, 2024

ROUTES AFFECTED:
Chippewa

#11 Chippewa / Events at the Enterprise Center & Stifel Theater

DETAILS

Effective: when 14th St. is blocked between Market & Clark
Duration: As needed

REROUTE DETAILS

Regular Route to Chouteau and 18th
Continue on Chouteau to 14th  
Left on 14th St
Left into the Civic Center Transit Center, Circle the transit center to assigned bus bay                                       

ALERT EFFECTIVE:
Feb 19, 2024 - Dec 31, 2024

ROUTES AFFECTED:
Chippewa

#13 Union #18 Taylor / Construction at Forest Park Pkwy and Taylor

DETAILS

Effective Date Monday, August 14, 2023 AS NEEDED until further notice

REROUTE DETAILS

Northbound
Regular Route to Taylor and Duncan
Right on Duncan
Left on Newstead
Left on W Pine
Right on Taylor into the regular route 
Southbound
Regular Route to Taylor and W Pine
Left on W Pine 
Right on Newstead
Right on Duncan
Left on Taylor into the regular route

ALERT EFFECTIVE:
Aug 14, 2023 - Apr 30, 2024

ROUTES AFFECTED:
Union
Taylor

#13 Union #18 Taylor / Construction at Forest Park Pkwy and Taylor

DETAILS

Effective Date Monday, August 14, 2023 AS NEEDED until further notice

REROUTE DETAILS

Northbound
Regular Route to Taylor and Duncan
Right on Duncan
Left on Newstead
Left on W Pine
Right on Taylor into the regular route 
Southbound
Regular Route to Taylor and W Pine
Left on W Pine 
Right on Newstead
Right on Duncan
Left on Taylor into the regular route

ALERT EFFECTIVE:
Aug 14, 2023 - Apr 30, 2024

ROUTES AFFECTED:
Union
Taylor

#1 Gold, 10 Gravois-Lindell, 18 Taylor / Construction on Taylor at Forest Park Multiple Routes

DETAILS

Effective Date:  Thursday April 28, 2022 As Needed

REROUTE DETAILS

Route TO the CWE 

Reg route to Forest Park and Taylor
Continue on Forest Park to Newstead
Right Newstead
Right Duncan
Left Taylor into Reg route

ALERT EFFECTIVE:
Dec 13, 2022 - Jun 01, 2024

ROUTES AFFECTED:
Gold
Gravois-Lindell
Taylor

#19 St. Louis Ave. / 2024 Go! St. Louis Marathon Saturday, April 27, 2024

DETAILS

Effective Date Saturday, April 27, 2024 from 6:30am until 4:00pm

On Saturday, April 27, 2024, starting at or before 6:30 am street closures will begin for the Greater St. Louis Marathon, the marathon will begin at 7:00 am affecting routes that service the   Downtown, Midtown, Soulard, Central West End, and Old North St. Louis areas.

REROUTE DETAILS

Eastbound 
Regular route to Tucker and Convention Plaza 
Right on Convention Plaza 
Left on Jefferson
Left on Lafayette
Left on Truman Pkwy into 18th St.
Right on Clark 
Right on 14th St
Right into the Civic Center Transit Center to the assigned bus bay  
Westbound  
Departing from the Civic Center Transit Center
Left on 14th St 
Right onto the on-ramp onto Highway 64/US 40 Westbound
Remain in the right lane 
Right and EXIT 38B JEFFERSON
Right on Jefferson 
Right on Delmar
Left on Tucker into regular route

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 27, 2024

ROUTES AFFECTED:
St Louis Ave

#30 Arsenal / 2024 Go! St. Louis Marathon Saturday, April 27, 2024

DETAILS

Effective Date Saturday, April 27, 2024 from 6:30am until 4:00pm

On Saturday, April 27, 2024, starting at or before 6:30 am street closures will begin for the Greater St. Louis Marathon, the marathon will begin at 7:00 am affecting routes that service the   Downtown, Midtown, Soulard, Central West End, and Old North St. Louis areas.

REROUTE DETAILS

Eastbound  
Regular route to 7th St. and Lafayette
Left on Lafayette
Right on Truman Parkway into 18th St.
Right on Clark
Right on 14th 
Right into the south entrance of the CCTC to the assigned bus bay
Westbound  
Departing from Civic Center Transit Center
Right on 14th 
Right on Chouteau 
Left on Truman Parkway 
Left on Lafayette 
Right on 7th into regular route

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 27, 2024

ROUTES AFFECTED:
Arsenal

#31 Chouteau / 2024 Go! St. Louis Marathon Saturday, April 27, 2024

DETAILS

Effective Date Saturday, April 27, 2024 from 6:30am until 4:00pm

On Saturday, April 27, 2024, starting at or before 6:30 am street closures will begin for the Greater St. Louis Marathon, the marathon will begin at 7:00 am affecting routes that service the   Downtown, Midtown, Soulard, Central West End, and Old North St. Louis areas.

REROUTE DETAILS

Eastbound  
Regular route to Chouteau and Jefferson 
Right on Jefferson
Left on Lafayette 
Left on Truman Parkway into 18th St 
Right on Clark
Right on 14th 
Right into the south entrance of the Civic Center Transit Center to the assigned bus bay
Westbound  
Departing from Civic Center Transit Center
Right on 14th 
Right on Chouteau 
Left on Truman Parkway 
Right on Lafayette
Right on Jefferson
Left on Chouteau into regular route

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 27, 2024

ROUTES AFFECTED:
Chouteau

#32 Dr. ML King / 2024 Go! St. Louis Marathon Saturday, April 27, 2024

DETAILS

Effective Date Saturday, April 27, 2024 from 6:30am until 4:00pm

On Saturday, April 27, 2024, starting at or before 6:30 am street closures will begin for the Greater St. Louis Marathon, the marathon will begin at 7:00 am affecting routes that service the Downtown, Midtown, Soulard, Central West End, and Old North St. Louis areas.

REROUTE DETAILS

Eastbound  
Regular route to Tucker and Convention Plaza
Right on Convention Plaza 
Left on Jefferson 
Left on Lafayette
Left on Truman Pkwy into 18th St.
Right on Clark
Right on 14th 
Right into the south entrance of the Civic Center Transit Center  to the assigned bus bay
Westbound 
Departing from the Civic Center Transit Center  
Left on 14th
Right onto the on-ramp onto Highway 64/US 40 Westbound
Remain in the right lane 
Right and EXIT 38B JEFFERSON
Right on Jefferson
Right on Delmar
Left on Tucker into regular route

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 27, 2024

ROUTES AFFECTED:
Dr ML King

#32 Dr. ML King #40 N Broadway / Events at the Enterprise Center

DETAILS

Effective Date: Monday, November 21, 2022 as needed during events at the Enterprise Center

REROUTE DETAILS

TO CIVIC CENTER
Regular route to 14th and Market,
Left on Market
Right on Tucker
Right on Clark
Left on 14th into the CCTC on the regular route                                              
LEAVING CIVIC CENTER
Regular route to 14th and Clark,
Right on Clark
Left on Tucker
Right on Olive St into the regular route 

ALERT EFFECTIVE:
Nov 21, 2022 - Dec 31, 2024

ROUTES AFFECTED:
Dr ML King
N Broadway

#34 Earth City / Hollywood Casino Amphitheater when Magellan is closed for concerts

DETAILS

May 27, 2023 AS NEEDED

REROUTE DETAILS

Counterclockwise
Regular route to Earth City Expressway and Riverport Drive
Veer Right onto Riverport Drive, 
Continue on Riverport Drive to the United Healthcare Parking Lot, 
Right onto the United Healthcare Parking Lot,
Safely turn around in the parking lot, 
Left onto Riverport Drive, serve the bus stop into regular route. 

ALERT EFFECTIVE:
May 27, 2023 - Dec 31, 2024

ROUTES AFFECTED:
Earth City

#40 Broadway / Crane on 10th at Olive

DETAILS

Effective Date Monday, April 22, 2024 until further notice

REROUTE DETAILS

Northbound  Only 
Regular  route to 14th/Olive, continue on 14th to Washington 
Right on Washington 
Right on 8th 
Left on Olive into the regular route

ALERT EFFECTIVE:
Apr 22, 2024 - May 31, 2024

ROUTES AFFECTED:
N Broadway

#40 Broadway / 2024 Go! St. Louis Marathon Saturday, April 27, 2024

DETAILS

Effective Date Saturday, April 27, 2024 from 6:30am until 4:00pm

On Saturday, April 27, 2024, starting at or before 6:30 am street closures will begin for the Greater St. Louis Marathon, the marathon will begin at 7:00 am affecting routes that service the   Downtown, Midtown, Soulard, Central West End, and Old North St. Louis areas.

REROUTE DETAILS

Southbound 
Regular Route to Broadway and Cass
Right on Cass
Left on Jefferson
Left on Lafayette
Left on Truman Pkwy into 18th St.
Right on Clark
Right on 14th
Right into the south entrance of the Civic Center Transit Center to the assigned bus bay
Northbound  
Departing from the Civic Center Transit Center
Left on 14th
Right onto the on-ramp to Highway 64/US40 Westbound
Remain in the right lane 
Right and EXIT 38B JEFFERSON
Right on Jefferson
Right on Delmar
Right on Tucker
Left on Olive into regular route

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 27, 2024

ROUTES AFFECTED:
N Broadway

#40 Broadway / St. Louis Battle Hawks

DETAILS

Effective Date:  Saturday, April 6, 2024
Duration:  As needed for the Battle Hawks games only.

REROUTE DETAILS

Southbound Only
Regular Route to Broadway and Cass,
Right pn Cass
Left on Tucker 
Right on Olive into the regular route

ALERT EFFECTIVE:
Apr 08, 2024 - Jul 31, 2024

ROUTES AFFECTED:
N Broadway

#40 Broadway / Reroute-Road Blockage on Locust past Tucker

DETAILS

Effective Date:  Wednesday, November 29, 2023
Duration:  Until Further Notice

REROUTE DETAILS

Southbound Only
Regular Route to Locust St. and Tucker Blvd.
Left on Tucker Blvd.
Right on Olive St.
Left on 14th St. into the regular route

ALERT EFFECTIVE:
Dec 15, 2023 - Apr 29, 2024

ROUTES AFFECTED:
N Broadway

#32 Dr. ML King #40 N Broadway / Events at the Enterprise Center

DETAILS

Effective Date: Monday, November 21, 2022 as needed during events at the Enterprise Center

REROUTE DETAILS

TO CIVIC CENTER
Regular route to 14th and Market,
Left on Market
Right on Tucker
Right on Clark
Left on 14th into the CCTC on the regular route                                              
LEAVING CIVIC CENTER
Regular route to 14th and Clark,
Right on Clark
Left on Tucker
Right on Olive St into the regular route 

ALERT EFFECTIVE:
Nov 21, 2022 - Dec 31, 2024

ROUTES AFFECTED:
Dr ML King
N Broadway

#41 Lee #74 Florissant / Events at the Enterprise Center

DETAILS

Effective Date: Monday, November 21, 2022 as needed during events at the Enterprise Center

REROUTE DETAILS

Southbound
Regular route to 14th and Market,
Left on Market
Right on Tucker
Right on Clark
Left on 14th into the CCTC on the regular route                                               
Northbound
Regular route to 14th and Clark,
Right on Clark
Left on Tucker 
Left on Olive St
Right on 14th into the regular route 

ALERT EFFECTIVE:
Nov 21, 2022 - Dec 31, 2024

ROUTES AFFECTED:
Lee
Florissant

#41 Lee / 2024 Go! St. Louis Marathon Saturday, April 27, 2024

DETAILS

Effective Date Saturday, April 27, 2024 from 6:30am until 4:00pm

On Saturday, April 27, 2024, starting at or before 6:30 am street closures will begin for the Greater St. Louis Marathon, the marathon will begin at 7:00 am affecting routes that service the   Downtown, Midtown, Soulard, Central West End, and Old North St. Louis areas.

REROUTE DETAILS

Southbound  
Regular route to 14th and Delmar
Right on Delmar
Left on Jefferson
Left on Lafayette
Left on Truman Pkwy into 18th St. 
Right on Clark
Right on 14th 
Right into the south entrance of the Civic Center Transit Center to the assigned bus bay
Northbound 
Departing from the Civic Center Transit Center
Left on 14th
Right onto the on-ramp onto Highway 64/40 Westbound
Remain in the right lane 
Right and EXIT 38B JEFFERSON
Right on Jefferson
Right on Delmar 
Left on 14th into regular route

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 27, 2024

ROUTES AFFECTED:
Lee

#42 Sarah / Construction on Taylor at Forest Park Multiple Routes

DETAILS

Effective Date:  Thursday April 28, 2022 As Needed

REROUTE DETAILS

Southbound
Reg route to Forest Park to Newstead
Left on Newstead
Right on Duncan
Left on Taylor into Reg route
Northbound
Regular route to Taylor and Duncan
Right on Duncan
Left on Newstead
Right on Forest Park into regular route

ALERT EFFECTIVE:
Dec 13, 2022 - Jul 01, 2024

ROUTES AFFECTED:
Sarah

#49 Lindbergh / Reroute due to road maintenance on Page Ave at Ashby

DETAILS

Effective Date: Tuesday, March 19, 2024 
Duration: As Needed 

REROUTE DETAILS

Southbound Only 
Regular Route to Page and Warson
Right on Warson
Left on Liberty 
Right on Ashby into the regular route

ALERT EFFECTIVE:
Mar 19, 2024 - Apr 30, 2024

ROUTES AFFECTED:
Lindbergh

#56 Kirkwood-Webster / Reroute due to Construction on Big Bend Blvd and Berry Rd

DETAILS

Effective Date Tuesday, December 12, 2023 As Needed until further notice.

REROUTE DETAILS

Eastbound 
Regular Route to Big Bend and Berry Rd
Continue on Big Bend
Left on Rock Hill
Right on E. Lockwood into the regular route
Westbound
Regular route to E. Lockwood and Rock Hill
Left on Rock Hill
Right on Big Bend in the regular route

ALERT EFFECTIVE:
Dec 12, 2023 - Apr 29, 2024

ROUTES AFFECTED:
Kirkwood-Webster

#59 Oakland / Reroute due to utility work on Kingshighway between Barnes Jewish Hospital Plaza and Children's Pl

DETAILS

Effective Date Thursday, April 18, 2024 as needed.

REROUTE DETAILS

Westbound

Departing from the Central West End Transit Center 
Right on Children’s Place (Nash Way)
Right on Taylor
Right on Clayton 
Continue on Clayton until the “Detour Sign”
Right on Hospital Drive
Right on Kingshighway into the regular route

Eastbound

Regular route to Barnes Plaza and Kingshighway
Continue on Kingshighway to Forest Park Parkway 
Right on Forest Park Parkway
Right on Taylor
Right on Children Place into regular route

ALERT EFFECTIVE:
Apr 18, 2024 - May 31, 2024

ROUTES AFFECTED:
Oakland

#70 Grand / Events at The Fabulous Fox Theatre

DETAILS

Effective Saturday, October 08, 2022 AS NEEDED during events at the Fabulous Fox Theatre

REROUTE DETAILS

Northbound
Regular Route to Grand and Lindell
Left on Lindell
Right on Spring 
Right on Delmar 
Left on Grand into regular route
Southbound
Regular Route to Grand and Delmar
Right on Delmar
Left on Spring
Left on Lindell 
Right on Grand into regular route  

ALERT EFFECTIVE:
Sep 15, 2023 - Dec 31, 2024

ROUTES AFFECTED:
Grand

#73 Carondelet / 2024 Go! St. Louis Marathon Saturday, April 27, 2024

DETAILS

Effective Date Saturday, April 27, 2024 from 6:30am until 4:00pm

On Saturday, April 27, 2024, starting at or before 6:30 am street closures will begin for the Greater St. Louis Marathon, the marathon will begin at 7:00 am affecting routes that service the   Downtown, Midtown, Soulard, Central West End, and Old North St. Louis areas.

REROUTE DETAILS

Northbound 
Regular route to Broadway and Lynch 
Continue on Broadway into 7th St  to Lafayette
Left on Lafayette
Right on Truman Parkway into 18th St.
Right on Clark 
Right on 14th
Right into 1st entrance of the Civic Center Transit Center to the assigned bus bay
Southbound  
Departing from Civic Center Transit Center
Right on 14th
Right on Chouteau 
Left on Truman Parkway/18th St.
Left on Lafayette 
Right on 7th St. into Broadway into the regular route

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 27, 2024

ROUTES AFFECTED:
Carondelet

#74 Florissant / 2024 Go! St. Louis Marathon Saturday, April 27, 2024

DETAILS

Effective Date Saturday, April 27, 2024 from 6:30am until 4:00pm

On Saturday, April 27, 2024, starting at or before 6:30 am street closures will begin for the Greater St. Louis Marathon, the marathon will begin at 7:00 am affecting routes that service the   Downtown, Midtown, Soulard, Central West End, and Old North St. Louis areas.

REROUTE DETAILS

Southbound  
Regular route to 14th and Delmar 
Right on Delmar 
Left on Jefferson 
Left on Lafayette
Left on Truman Pkwy into 18th St.
Right on Clark
Right on 14th 
Right into the south entrance of the Civic Center Transit Center to the assigned bus bay

Northbound 
Departing from the Civic Center Transit Center
Left on 14th
Right onto the on-ramp onto Highway 64/40 Westbound
Remain in the right lane 
Right and EXIT 38B JEFFERSON
Right on Jefferson
Right on Delmar 
Left on 14th into regular route

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 27, 2024

ROUTES AFFECTED:
Florissant

#41 Lee #74 Florissant / Events at the Enterprise Center

DETAILS

Effective Date: Monday, November 21, 2022 as needed during events at the Enterprise Center

REROUTE DETAILS

Southbound
Regular route to 14th and Market,
Left on Market
Right on Tucker
Right on Clark
Left on 14th into the CCTC on the regular route                                               
Northbound
Regular route to 14th and Clark,
Right on Clark
Left on Tucker 
Left on Olive St
Right on 14th into the regular route 

ALERT EFFECTIVE:
Nov 21, 2022 - Dec 31, 2024

ROUTES AFFECTED:
Lee
Florissant

#76 McDonnell-Waterford / Reroute due to Construction at James S McDonnell and Valley Industries

DETAILS

Effective Date:  Sunday, November 26, 2023
Duration: Until Further Notice
Only on select trips that service Valley Industries

REROUTE DETAILS

Northbound

Regular Route to James S McDonnell and Banshee
Left on Banshee
Right on N Lindbergh 
Right on James S McDonnell 
Left into Valley Industries into the regular route

Southbound 
After servicing Valley Industries 
Right on James S McDonnell
Left on N Lindbergh
Left on Missouri Bottom Rd which will turn into Banshee Rd 
Right on James S McDonnell into the regular route

ALERT EFFECTIVE:
Nov 27, 2023 - Apr 30, 2024

ROUTES AFFECTED:
McDonnell-Waterford

#76 McDonnell-Waterford / Reroute due to Construction on James S McDonnell between Banshee and Valley Industries

DETAILS

Effective Date Sunday, November 26, 2023 Until further notice

REROUTE DETAILS

Northbound
Regular Route to James S McDonnell and Banshee
Left on Banshee
Right on N Lindbergh into the regular route
Southbound 
Regular Route to Lindbergh and James S McDonnell, 
Continue on Lindbergh to Missouri Bottom Rd 
Left on Missouri Bottom Rd which will turn into Banshee Rd 
Right on James S McDonnell into the regular route

ALERT EFFECTIVE:
Mar 14, 2024 - May 31, 2024

ROUTES AFFECTED:
McDonnell-Waterford

#77 Village Square / Reroute due to construction near PepsiCo

DETAILS

Effective Date Monday, January 15, 2024 until Sunday, March 31, 2024

REROUTE DETAILS

Northbound 
Trips serving PepsiCo leave N. Hanley Transit Center leave 3 minutes later than scheduled times and do not enter PepsiCo
Southbound 
Trips to N. Hanley serving PepsiCo do not enter PepsiCo. 
Arrive early at N. Hanley Transit Center

ALERT EFFECTIVE:
Jan 08, 2024 - Apr 30, 2024

ROUTES AFFECTED:
Village Square

#79 Ferguson / Construction on Dade and Airport Rd.

DETAILS

Effective Date Friday, December 22, 2023 AS NEEDED until further notice

REROUTE DETAILS

Northbound
Regular Route to Dade Ave. and Carson Rd.
Right on Carson Rd.
Left on Harvey Ave.
Right on Airport Rd. into regular route
Southbound
Regular Route to Airport Rd. and Harvey Ave.
Left on Harvey Ave.
Right on Carson Rd.
Left on Dade Ave into regular route.

ALERT EFFECTIVE:
Dec 22, 2023 - Apr 30, 2024

ROUTES AFFECTED:
Ferguson

#90 Hampton / Construction at the entrance to Forest Park

DETAILS

Effective Date:  Thursday, March 7, 2024
 
Duration:  Until further notice

REROUTE DETAILS

Northbound Only
Regular route to Fine Arts and Lagoon, Left onto Lagoon
Right onto Skinker
Right onto Forest Park
Left onto De Baliviere into the regular route

ALERT EFFECTIVE:
Mar 08, 2024 - May 08, 2024

ROUTES AFFECTED:
Hampton

#90 Hampton / Events/Traffic in Forest Park

DETAILS

Effective Date Saturday, November 18, 2023 AS NEEDED Until further notice.

REROUTE DETAILS

Southbound
Regular route to DeBaliviere and Forest Park Pkwy.
Right on Forest Park Pkwy.
Left on Skinker
Left and enter I-64 East
Right and exit 34B Hampton Ave. 
Right on Hampton into the regular route                                               
Northbound
Regular route to Hampton and I-64 West
Left and enter I-64 West
Remain in the right lane
Right and exit 34A Clayton Rd/Skinker
Right on Skinker
Right on Forest Park Pkwy
Left on DeBaliviere into regular route

ALERT EFFECTIVE:
Nov 17, 2023 - Sep 30, 2024

ROUTES AFFECTED:
Hampton

#94 Page / St. Louis City Soccer Club (Events at City Park)

DETAILS

Effective Date Saturday, March 4, 2023 AS NEEDED for theduration of all Events at City Park

REROUTE DETAILS

Eastbound
Regular route to Market and Jefferson,
Right on Jefferson
Left on Chouteau
Left on 14th St.
Left and enter into the south entrance of the CCTC to the assigned bus bay.
Westbound
Departing from the CCTC, 
Right on 14th St. 
Right on Chouteau
Right on Jefferson,
Left on Market into the regular route. 

ALERT EFFECTIVE:
Mar 16, 2023 - Dec 31, 2024

ROUTES AFFECTED:
Page

#94 Page / Event's at Chaifetz Arena

DETAILS

Effective Date Saturday, March 18, 2023 as needed during all events at Chaifetz Arena

REROUTE DETAILS

Eastbound 
Regular Route to Compton and Delmar
Left on Delmar
Right on Jefferson
Left on Market Into Regular Route
Westbound 
Regular Route on Market and Jefferson
Right on Jefferson
Left on Delmar
Right on Compton Into Regular Route

ALERT EFFECTIVE:
Mar 16, 2023 - Dec 31, 2024

ROUTES AFFECTED:
Page

#94 Page / Events at the Enterprise Center

DETAILS

Effective Date: Monday, November 21, 2022 as needed during events at Enterprise Center

REROUTE DETAILS

Eastbound
Regular route to Market and 14th, continue on Market to Tucker,
Right on Tucker
Right on Clark 
Left on 14th into regular route       

Westbound
Regular route to 14th and Clark
Right on Clark
Left on Tucker
Left on Pine
Left on 14th 
Right on Market St into regular route 

ALERT EFFECTIVE:
Nov 21, 2022 - Dec 31, 2024

ROUTES AFFECTED:
Page

#94 Page / 2024 Go! St. Louis Marathon Saturday, April 27, 2024

DETAILS

Effective Date Saturday, April 27, 2024 from 6:30am until 4:00pm

On Saturday, April 27, 2024, starting at or before 6:30 am street closures will begin for the Greater St. Louis Marathon, the marathon will begin at 7:00 am affecting routes that service the   Downtown, Midtown, Soulard, Central West End, and Old North St. Louis areas.

REROUTE DETAILS

Eastbound  
Regular route to  Dr. Martin Luther King and Compton
Continue on Dr. Martin Luther King to Jefferson
Right on Jefferson
Left on Lafayette
Left on Truman Pkwy into 18th St.
Right on Clark
Right on 14th
Right into the south entrance of the Civic Center Transit Center to the assigned bus bay
Westbound   
Departing from the Civic Center Transit Center
Left on 14th
Right onto the on-ramp onto Highway64/US-40 Westbound
Remain in the right lane 
Right and EXIT 38B JEFFERSON
Right on Jefferson
Left on Dr. Martin Luther King into Reg Route

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 27, 2024

ROUTES AFFECTED:
Page

#95 Kingshighway / Reroute due to utility work on Kingshighway between Barnes Jewish Hospital Plaza and Children's Pl

DETAILS

Effective Date Thursday, April 18, 2024 as needed.

REROUTE DETAILS

Southbound

Departing from the Central West End Transit Center 
Right on Children’s Place (Nash Way)
Left on Taylor
Left on Forest Park
Left on Kingshighway into regular route

Northbound

Regular route to Barnes Plaza and Kingshighway
Continue on Kingshighway to Forest Park Parkway 
Right on Forest Park Parkway
Right on Taylor
Right on Children Place into regular route

ALERT EFFECTIVE:
Apr 18, 2024 - May 31, 2024

ROUTES AFFECTED:
Kingshighway

#95 Kingshighway / Construction on Taylor at Forest Park Multiple Routes

DETAILS

Effective Date:  Thursday April 28, 2022 As Needed

REROUTE DETAILS

Southbound
Reg route to Forest Park and Taylor
Continue on Forest Park to Newstead
Right on Newstead
Right on Duncan
Left on Taylor into Reg route

ALERT EFFECTIVE:
Dec 13, 2022 - Jun 01, 2024

ROUTES AFFECTED:
Kingshighway

#97 Delmar / 2024 Go! St. Louis Marathon Saturday, April 27, 2024

DETAILS

Effective Date Saturday, April 27, 2024 from 6:30am until 4:00pm

On Saturday, April 27, 2024, starting at or before 6:30 am street closures will begin for the Greater St. Louis Marathon, the marathon will begin at 7:00 am affecting routes that service the   Downtown, Midtown, Soulard, Central West End, and Old North St. Louis areas.

REROUTE DETAILS

Eastbound
Regular route to Delmar and Jefferson
Right on Jefferson
Left on Lafayette
Left on Truman Pkwy into 18th St.
Right on Clark
Right on 14th
Right into the south entrance of the Civic Center Transit Center to the assigned bus bay
Westbound
Departing from the Civic Center Transit Center
Left on 14th
Right onto the on-ramp onto Highway64/US-40 Westbound
Remain in the right lane 
Right and EXIT 38B JEFFERSON
Right on Jefferson
Left on Delmar into Reg Route

ALERT EFFECTIVE:
Apr 25, 2024 - Apr 27, 2024

ROUTES AFFECTED:
Delmar

#98 Ballas-North Hanley / Reroute due to Construction on Olive Blvd at New Ballas Road

DETAILS

Effective Date: Thursday, March 21, 2024 until further notice

REROUTE DETAILS

Northbound
Regular Route to New Ballas Rd. and Olive Blvd.
Right on Olive Blvd.
Left on Craig Rd. into the regular route
Southbound
Regular route New Ballas and Craig Road 
Continue south on Craig Road 
Right on Olive 
Left on New Ballas regular route. 

ALERT EFFECTIVE:
Mar 20, 2024 - Apr 30, 2024

ROUTES AFFECTED:
Ballas-North Hanley

#174x Halls Ferry Express / Reroute due to construction on Halls Ferry between Broadway and Newby

DETAILS

Effective Date:  Monday, March 11,2024  

Duration:  As Needed 

REROUTE DETAILS

Northbound 
Regular Route Broadway and Halls Ferry 
Continue on Broadway to Riverview Blvd.
Left onto Riverview Blvd 
Safely merge onto the Halls Ferry Circle into the regular route
Southbound
Regular route to the Halls Ferry Circle 
Safely merge onto the circle, 
Exit right onto Riverview Blvd (by Imo’s Pizza) and continue on Riverview Blvd to Broadway 
Right onto Broadway into the regular route

ALERT EFFECTIVE:
Mar 11, 2024 - Apr 28, 2024

ROUTES AFFECTED:
Halls Ferry Express

#174X Halls Ferry Express / Construction on Halls Ferry between McLaran and Newby

DETAILS

Effective Date Thursday, March 28, 2024 Until Further Notice

REROUTE DETAILS

Southbound
Regular Route to Halls Ferry and McLaran
Left to McLaran
Right to Broadway into regular route

Northbound
Regular Route to Broadway and Baden
Left to Baden
Right to Riverview enter Riverview Circle  into regular route

ALERT EFFECTIVE:
Mar 29, 2024 - Apr 30, 2024

ROUTES AFFECTED:
Halls Ferry Express

Illinois

#1 Main Street-State Street / Construction for the St. Clair County Courthouse

DETAILS

Effective Date: Monday, March 11, 2024
Duration: Until further notice

REROUTE DETAILS

Eastbound only
Regular Route to W. Washington St. and 2nd St.,
Right on 2nd St.
Left on W. Lincoln St. 
Left on S. Illinois/Il-159
Right on W. Washington St. into the regular route

ALERT EFFECTIVE:
Mar 04, 2024 - May 31, 2024

ROUTES AFFECTED:
Main Street - State Street

#1 Main St.-State St. / Bus Loop Construction at the Fairview Heights Transit Center

DETAILS

Effective Date Monday, April 8, 2024 until Friday, May 3, 2024

REROUTE DETAILS

Eastbound
Regular Route to Regular route to St. Clair Ave. and 3rd Ave. (entrance to the Fairview Heights ML/TC, continue on St. Clair Ave. to IL-161,
Right on IL-161
Right at the entrance to the Metro Link (Lynn Lee Ct.)
Left at the stop sign into the Long-Term Parking Lot and proceed to the temporary bus loading zone.
Westbound 
Regular route to IL-161 and the entrance to Metro Link entrance (Lynn Lee Ct.),
Left at the entrance to the Metro Link (Lynn Lee Ct.)
Left at the stop sign to the Long-Term Parking Lot, proceed to the temporary bus loading zone.

ALERT EFFECTIVE:
Apr 01, 2024 - May 03, 2024

ROUTES AFFECTED:
Main Street - State Street

#6 Rosemont / Bus Loop Construction at the Fairview Heights Transit Center

DETAILS

Effective Date Monday, April 8, 2024 until Friday, May 3, 2024

REROUTE DETAILS

Eastbound
Regular Route to Regular route to St. Clair Ave. and 3rd Ave. (entrance to the Fairview Heights ML/TC), continue on St. Clair Ave. to IL-161,
Right on IL-161
Right at the entrance to the Metro Link (Lynn Lee Ct.)
Left at the stop sign into the Long-Term Parking Lot and proceed to the temporary bus loading zone.
Westbound 
Departing from the Fairview Heights Transit Center, 
Right on Metro Way/Lynn Lee Ct., 
Left on IL 161, Left on St Clair Ave. regular route.  

ALERT EFFECTIVE:
Apr 01, 2024 - May 03, 2024

ROUTES AFFECTED:
Rosemont

#8 Alta Sita / Reroute Due to Construction on the Bridge of N. 26th St. in between Bond and Missouri

DETAILS

Effective Date:  Tuesday, April 16, 2024
Duration: Until Further Notice

REROUTE DETAILS

Southbound 
Regular Route to 26th and Missouri
Right on Missouri
Left on 18th
Right on Broadway
Left on 17th
Left on Bond
Continue to 26th St into regular route

Northbound
Regular Route to Bond and 26th St
Continue on Bond to 17th
Right on 17th St
Right on Broadway 
Left on 18th St
Right on Missouri Ave
Left on 26th St into regular route

ALERT EFFECTIVE:
Apr 16, 2024 - May 31, 2024

ROUTES AFFECTED:
Alta Sita

#12 O'Fallon-Fairview Heights / Bus Loop Construction at the Fairview Heights Transit Center

DETAILS

Effective Date Monday, April 8, 2024 until Friday, May 3, 2024

REROUTE DETAILS

Westbound
Regular Route to St. Clair Ave. and IL-161,
Left on IL-161
Right at the entrance to the Metro Link (Lynn Lee Ct.)
Left at the stop sign to the Long-Term Parking Lot, proceed to the temporary bus loading zone.
Left/Right
Into regular route
Eastbound 
Departing from the Fairview Heights Transit Center, Right Metro Way/Lynn Lee Ct., Left on IL 161, 
Right on St Clair Ave. into the regular route.  

ALERT EFFECTIVE:
Apr 01, 2024 - May 03, 2024

ROUTES AFFECTED:
OFallon-Fairview Heights

#13 Caseyville / Bus Loop Construction at the Fairview Heights Transit Center

DETAILS

Effective Date Monday, April 8, 2024 until Friday, May 3, 2024

REROUTE DETAILS

Eastbound
Regular Route to Regular route to St. Clair Ave. and 3rd Ave. (entrance to the Fairview Heights ML/TC, continue on St. Clair Ave. to IL-161,
Right on IL-161
Right at the entrance to the Metro Link (Lynn Lee Ct.)
Left at the stop sign into the Long-Term Parking Lot and proceed to the temporary bus loading zone.
Westbound 
Departing from the Fairview Heights Transit Center, 
Right on Metro Way/Lynn Lee Ct., 
Left on IL 161, Left on St Clair Ave. into the regular route

ALERT EFFECTIVE:
Apr 01, 2024 - May 03, 2024

ROUTES AFFECTED:
Caseyville

#16 St. Clair Square / Construction at the Swansea Station

DETAILS

Effective Date Monday, March 4, 2024 until Friday, May 31st, 2024

REROUTE DETAILS

Southbound 
Regular Route to IL-159 and Metro Way, 
Right on Metro Way
Veer left to the temporary bus stop and continue through the parking lot,
Left on Metro Way into the regular route
Northbound
Regular Route to IL-159 and Metro Way, 
Left on Metro Way
Veer left to the temporary bus stop and continue through the parking lot,
Left on Metro Way into the regular route

ALERT EFFECTIVE:
Mar 04, 2024 - May 31, 2024

ROUTES AFFECTED:
St Clair Square

#16 St. Clair Square / Reroute due to construction on Vicksburg between Denvershire and Cedar Mountain

DETAILS

Effective Date Wednesday April 3, 2024 Until further notice

REROUTE DETAILS

Southbound 
Regular Route to Vicksburg and Cedar Mountain 
Left on Cedar Mountain
Right on Fort Henry
Right on Denvershire into regular route 
Northbound 
Regular Route to Vicksburg and Denvershire continue on Denvershire to Fort Henry
Left on Fort Henry
Left on Cedar Mountain
Right on Vicksburg into the regular route

ALERT EFFECTIVE:
Apr 03, 2024 - Apr 30, 2024

ROUTES AFFECTED:
St Clair Square

Elevator Alerts

Out Of Service

ALERT EFFECTIVE:
Apr 22, 2024 - May 02, 2024

METROLINK STATIONS AFFECTED:
Grand Station Southbound

Out Of Service

ALERT EFFECTIVE:
Apr 18, 2024 - Apr 28, 2024

METROLINK STATIONS AFFECTED:
Laclede's Landing Station

Contact to Listing Owner

Captcha Code