ALERT: Service Change on Monday, December 2 | Changes to 25 Current MetroBus Routes Read More!
x
Have a media request? Contact the Metro Communications Department at 314-486-5553.
April 13, 2021

MetroLink Work Scheduled April 14-16

MetroLink passengers may need to allow extra time for their evening commutes this week as construction work along the light rail system may cause minor delays. On Wednesday through Friday (April 14-16) from 8 p.m. to end of service, MetroLink will operate on a single track at the Central West End MetroLink Station to accommodate construction work at the station.

During these periods, Blue Line MetroLink trains will only operate between the Shrewsbury-Lansdowne I-44 and Forest Park-DeBaliviere MetroLink Stations.

  • Westbound Blue Line passengers will need to board a Red Line train between the Fairview Heights and Central West End MetroLink Stations, and travel to the Forest Park-DeBaliviere Station to transfer to a Blue Line train and continue their westbound trips.
  • Eastbound Blue Line passengers will need to board a Red Line train at the Forest Park-DeBaliviere Station to continue their eastbound trips.
  • Red Line MetroLink passengers may experience delays of 5 minutes.
  • Passengers should allow 10 minutes when transferring between Red Line and Blue Line.

For more information, visit the Rider Alert section on metrostlouis.org or contact Metro Transit Information at 314-231-2345 (phone) or 314-207-9786 (text), Monday to Friday from 7 a.m. to 6 p.m.

About Metro Transit
Metro Transit operates the St. Louis region’s public transportation system which includes more 400 clean-burning diesel buses that serve 68 MetroBus routes in eastern Missouri and southwestern Illinois. Metro also operates MetroLink light rail vehicles on 46 miles of track serving 38 stations in the two-state area, and operates Metro Call‑A‑Ride, a paratransit fleet of 123 vans. Metro Transit is a Bi-State Development enterprise.

Archives