MetroLink Work Scheduled August 18-21
MetroLink Red Line riders are encouraged to allow a little extra time for their evening commutes next week as maintenance work on the MetroLink system may result in minor delays for some passengers. To accommodate the crews, MetroLink will operate on a single track at the Rock Road MetroLink Station and Wellston MetroLink Station.
Tuesday and Wednesday (August 18 & 19) from 11:30 p.m. until end of service, and Thursday and Friday (August 20 & 21) from 8 p.m. until end of service, MetroLink will operate on a single track at the Rock Road and Wellston MetroLink Stations.
- Red Line passengers may experience delays of 5 to 10 minutes during this single-track operation.
- Blue Line service will not be impacted by the maintenance work.
Updates on MetroLink operations can be found at www.metrostlouis.org in the Rider Alert section.
About Metro
Metro is the operator of the St. Louis region’s public transportation system, which includes the 87 vehicle, 46-mile MetroLink light rail system; 391 MetroBus vehicle fleet that operates on 77 MetroBus routes in Missouri and Illinois; and Metro Call‑A‑Ride, a paratransit fleet of 120 vans. Metro is an enterprise of Bi-State Development (BSD), which also owns and operates St. Louis Downtown Airport and its surrounding industrial business park; the Gateway Arch Riverboats, as well as operates the Gateway Arch Revenue Collections Center and Gateway Arch trams. BSD also operates the Bi-State Development Research Institute and the Regional Freight District.