ALERT: Service Change on Monday, December 2 | Changes to 25 Current MetroBus Routes Read More!
x
Have a media request? Contact the Metro Communications Department at 314-486-5553.
February 17, 2020

MetroLink Work Scheduled February 17-21

MetroLink passengers may need to allow extra time for their evening commutes this week as construction work along the light rail system will require changes to MetroLink service.

On Monday through Friday (February 17-21) from 8 p.m. to end of service, MetroLink will operate on a single track at the Central West End MetroLink Station to accommodate construction work at the station. During these periods, Blue Line MetroLink trains will only operate between the Shrewsbury-Lansdowne I-44 and Forest Park-DeBaliviere MetroLink Stations.

  • Westbound Blue Line passengers will need to board a Red Line train between the Fairview Heights and Central West End MetroLink Stations, and travel to the Forest Park-DeBaliviere Station to transfer to a Blue Line train and continue their westbound trips.
  • Eastbound Blue Line passengers will need to board a Red Line train at the Forest Park-DeBaliviere Station to continue their eastbound trips.
  • Red Line MetroLink passengers may experience delays of 5 minutes.
  • Passengers should allow 10 minutes when transferring between Red Line and Blue Line

For more information, visit the Rider Alert section on metrostlouis.org or contact Metro Transit Information by calling 314-231-2345 or 618-271-2345 or texting 314-207-9786, Monday through Friday from 7 a.m. to 6 p.m.

About Metro Transit
Metro Transit operates the St. Louis region’s public transportation system which includes 400 clean-burning diesel buses that serve 77 MetroBus routes in eastern Missouri and southwestern Illinois. Metro also operates MetroLink light rail vehicles on 46 miles of track serving 38 stations in the two-state area, and operates Metro Call‑A‑Ride, a paratransit fleet of 122 vans. Metro Transit is a Bi-State Development enterprise.

Archives