MetroLink Work Scheduled for October 2-8
Blue Line MetroLink riders may want to allow a few extra minutes for their commutes next week as maintenance work along the light rail system may result in brief delays.
Monday through Friday (October 2-6) from 8 p.m. until the end of service, MetroLink will operate on a single track at the Sunnen and Maplewood-Manchester MetroLink Stations to allow crews to perform track maintenance.
- Blue Line MetroLink passengers may experience delays of up to 5 minutes.
- Red Line MetroLink service will not be impacted.
On Saturday and Sunday (October 7-8) from the beginning of service until the end of service, MetroLink will operate on a single track at the Sunnen and Maplewood-Manchester MetroLink Stations to allow crews to perform track maintenance.
- Blue Line MetroLink passengers may experience delays of up to 5 minutes.
- Red Line MetroLink service will not be impacted.
Updates on MetroLink operations can be found at metrostlouis.org in the Rider Alert section.
About Metro
Metro is the operator of the St. Louis region’s public transportation system, which includes the 87 vehicle, 46-mile MetroLink light rail system; approximately 400 vehicle MetroBus fleet that operates on 83 MetroBus routes in Missouri and Illinois; and Metro Call‑A‑Ride, a paratransit fleet of 122 vans. Metro is an enterprise of Bi-State Development (BSD), which also owns and operates St. Louis Downtown Airport, the Bi-State Development Research Institute, the Gateway Arch Riverboats, and operates the Gateway Arch Trams and Revenue Collections Center. BSD also operates the St. Louis Regional Freightway.