Have a media request? Contact the Metro Communications Department at 314-486-5553.
September 11, 2015

MetroLink Work Scheduled September 14 – 17

Light rail maintenance work scheduled September 14-17 may result in short delays for some Red Line MetroLink commuters. To accommodate crews replacing wooden rail ties, MetroLink will operate on a single track at the North Hanley, UMSL North and UMSL South MetroLink Stations.

On Monday through Thursday (September 14-17) from 8 p.m. until end of service, MetroLink will operate on a single track at the North Hanley, UMSL North and UMSL South MetroLink Stations.

  • Red Line passengers may experience delays of 5 to 10 minutes during this single-track operation.
  • Blue Line service will not be impacted.                                                       

Updates on MetroLink operations can be found at www.metrostlouis.org in the Rider Alert section.

About Metro

Metro is the operator of the St. Louis region’s public transportation system, which includes the 87 vehicle, 46-mile MetroLink light rail system; 391 MetroBus vehicle fleet that operates on 77 MetroBus routes in Missouri and Illinois; and Metro Call‑A‑Ride, a paratransit fleet of 120 vans. Metro is an enterprise of Bi-State Development (BSD), which also owns and operates St. Louis Downtown Airport and its surrounding industrial business park; the Gateway Arch Riverboats, as well as operates the Gateway Arch Revenue Collections Center and Gateway Arch trams. BSD also operates the Bi-State Development Research Institute and the Regional Freight District.

Archives