Have a media request? Contact the Metro Communications Department at 314-486-5553.
April 27, 2022

MetroLink Work Scheduled April 11-15

MetroLink passengers may need to allow extra time for their evening commutes next week as construction work along the light rail system will require changes to MetroLink service.

On Monday, Wednesday, Thursday and Friday (April 11, 13, 14, 15) from 8:00 p.m. through the end of service and Tuesday (April 12) from 11:30 p.m. through the end of service, MetroLink will operate on a single track at Union Station and Civic Center MetroLink Stations to accommodate maintenance work. During these periods, Blue Line MetroLink trains will only operate between the Forest Park-DeBaliviere and Shrewsbury-Lansdowne I-44 MetroLink Stations.

  • Westbound Blue Line passengers will need to board a Red Line train between the Fairview Heights and Central West End MetroLink Stations, and travel to the Forest Park-DeBaliviere Station to transfer to a Blue Line train and continue their westbound trips.
  • Eastbound Blue Line passengers will need to board a Red Line train at the Forest Park-DeBaliviere Station to continue their eastbound trips.
  • Red Line MetroLink passengers may experience delays of 5 minutes.
  • Passengers should allow 10 minutes when transferring between Red Line and Blue Line

For more information, visit the Rider Alert section on metrostlouis.org or contact Metro Transit Information by calling 314-231-2345 or 618-271-2345 or texting 314-207-9786, Monday through Friday from 7 a.m. to 6 p.m.

Metro Transit

Metro Transit operates the St. Louis region’s public transportation system, which includes 18 battery electric buses and nearly 400 clean-burning diesel buses that serve 59 MetroBus routes in eastern Missouri and southwestern Illinois. Metro also operates MetroLink light rail vehicles on 46 miles of track serving 38 stations in the two-state area, and operates Metro Call‑A‑Ride, a paratransit fleet of 122 vans. Metro Transit is a Bi-State Development enterprise. 

Archives