MetroLink Work Scheduled April 3-7
MetroLink riders should allow extra time for commutes next week as maintenance work may result in short delays for Red Line and Blue Line passengers.
On Monday and Tuesday (April 3 & 4) from 10 a.m. until 2:30 p.m., MetroLink will operate on a single track between the Belleville and College MetroLink Stations to accommodate a survey crew.
- Red Line MetroLink passengers may experience delays of 5 minutes.
- Blue Line MetroLink service will not be impacted.
On Monday through Friday (April 3-7) from 8 p.m. until the end of service., MetroLink will operate on a single track at the Sunnen and Maplewood-Manchester MetroLink Stations so crews can perform track maintenance.
- Blue Line MetroLink passengers may experience delays of 5 minutes.
- Red Line MetroLink service will not be impacted.
Updates on MetroLink operations can be found at metrostlouis.org in the Rider Alert section.
About Metro
Metro is the operator of the St. Louis region’s public transportation system, which includes the 87 vehicle, 46-mile MetroLink light rail system; approximately 400 vehicle MetroBus fleet that operates on 79 MetroBus routes in Missouri and Illinois; and Metro Call‑A‑Ride, a paratransit fleet of 122 vans. Metro is an enterprise of Bi-State Development (BSD), which also owns and operates St. Louis Downtown Airport, the Bi-State Development Research Institute, the Gateway Arch Riverboats, and operates the Gateway Arch Trams and Revenue Collections Center. BSD also operates the St. Louis Regional Freightway.