MetroLink Work Scheduled June 1-6
MetroLink passengers may need to allow extra time for their commutes this week as construction work along the light rail system may cause slight delays.
On Monday through Friday (June 1-5) from 8 p.m. to end of service, and all day on Saturday (June 6), MetroLink will operate on a single track at the Central West End MetroLink Station to accommodate construction work at the station. During these periods, Blue Line MetroLink trains will only operate between the Shrewsbury-Lansdowne I-44 and Forest Park-DeBaliviere MetroLink Stations.
- Westbound Blue Line passengers will need to board a Red Line train between the Fairview Heights and Central West End MetroLink Stations, and travel to the Forest Park-DeBaliviere Station to transfer to a Blue Line train and continue their westbound trips.
- Eastbound Blue Line passengers will need to board a Red Line train at the Forest Park-DeBaliviere Station to continue their eastbound trips.
- Red Line MetroLink passengers may experience delays of 5 minutes.
- Passengers should allow 10 minutes when transferring between Red Line and Blue Line.
On Monday through Friday (June 1-5) from 8 p.m. to end of service, MetroLink will operate on a single track at the Forsyth and Clayton MetroLink Stations to allow for track maintenance. During these periods, Blue Line MetroLink trains may experience delays of up to 5 minutes. Red Line service will be unaffected.
For more information, visit the Rider Alert section on metrostlouis.org or contact Metro Transit Information at 314-231-2345 (phone) or 314-207-9786 (text), Monday to Friday from 7 a.m. to 6 p.m.