MetroLink Work Scheduled April 13-19
MetroLink passengers may need to allow extra time for their commutes this week as construction work along the light rail system will require changes to MetroLink service.
On Monday through Friday (April 13-17) and Sunday (April 19) from 8 p.m. to end of service; and all-day on Saturday (April 18); MetroLink will operate on a single track at the Central West End MetroLink Station to accommodate construction work at the station. During these periods, Blue Line MetroLink trains will only operate between the Shrewsbury-Lansdowne I-44 and Forest Park-DeBaliviere MetroLink Stations.
- Westbound Blue Line passengers will need to board a Red Line train between the Fairview Heights and Central West End MetroLink Stations, and travel to the Forest Park-DeBaliviere Station to transfer to a Blue Line train and continue their westbound trips.
- Eastbound Blue Line passengers will need to board a Red Line train at the Forest Park-DeBaliviere Station to continue their eastbound trips.
- Red Line MetroLink passengers may experience delays of 5 minutes.
- Passengers should allow 10 minutes when transferring between Red Line and Blue Line.
On Tuesday through Friday (April 14-17) from 8 p.m. to end of service, MetroLink will also operate on a single track at the Forsyth and Clayton MetroLink Stations to allow for track maintenance. During these periods, Blue Line MetroLink trains may experience delays of up to 5 minutes. Red Line service will be unaffected.
For more information, visit the Rider Alert section on metrostlouis.org or contact Metro Transit Information by calling 314-231-2345 or 618-271-2345 or texting 314-207-9786, Monday through Friday from 7 a.m. to 6 p.m.