MetroLink Work Scheduled November 3 & 4
MetroLink riders should allow extra time for their midday commutes on Thursday and Friday this week as work on the MetroLink system may result in minor delays for some passengers.
To accommodate survey crews, MetroLink will operate on a single track between the Belleville and College MetroLink Stations on Thursday and Friday (November 3 & 4) from 10 a.m. until 2:30 p.m.
Red Line passengers may experience delays of 5 to 10 minutes. Blue Line service will not be affected by this work.
Updates on MetroLink operations can be found at www.metrostlouis.org in the Rider Alert section.
About Metro
Metro is the operator of the St. Louis region’s public transportation system, which includes the 87 vehicle, 46-mile MetroLink light rail system; 399 MetroBus vehicle fleet that operates on 78 MetroBus routes in Missouri and Illinois; and Metro Call‑A‑Ride, a paratransit fleet of 122 vans. Metro is an enterprise of Bi-State Development (BSD), which also owns and operates St. Louis Downtown Airport and the Gateway Arch Riverboats, as well as operates the Gateway Arch Revenue Collections Center and Gateway Arch trams. BSD also operates the Bi-State Development Research Institute and the St. Louis Regional Freightway.